Align the insulation boards with the chalk lines and lay them onto the deck.
Roof blocking on top of rigid.
This is the method a friend and i did in his basement.
After installing several layers of rigid foam above the roof sheathing these workers installed plywood above the rigid foam.
They may extend a short distance beyond the wall to form the eaves and protect the sides of the building.
When we do complex roofs in high snow load areas like ski resorts we typically have the roof deck act as the air control layer and provide a high level of thermal resistance at the roof deck either rigid insulation directly above the roof deck or high density spray foam directly under the roof deck and then we provide an over roof creating a vented space over the top of the entire assembly.
Stagger the joints to.
Make sure there is sufficient soffit venting.
And roof overhang together into a beam.
If you install just one layer you ll need to fasten the osb or plywood to the concrete slab with long tapcon screws that extend through the rigid foam.
Use a chalk box to snap chalk lines on the roof deck.
This insulation should be screwed down to the metal deck.
This air seal is pretty darn good.
Rafters rest on the top wall plate.
Note that there was no air seal at this location originally.
The type of roof.
Install nailbase for cladding.
Then on top of the rigid thermal insulation there should be a coverboard.
Ladder style blocking provides the structure of a torsion box which ties the fascia soffit.
The plywood was fastened through the rigid foam to the rafters with long screws.
Install rigid insulation board in multiple layers with joints offset vertically and horizontally between adjacent layers.
The three layers of rigid insulation have yet to be installed over the top of the roof decking at this point.
I have to come clean here as well.
Rafters are nailed to the plate not framed into it.
Apply a new roof deck over the 2x4s and dry in with roofing felt or impermeable synthetic roofing underlayment.
Rigid thermal insulation on the top of this air control layer in two layers at least with the joints off set horizontally and vertically.
Butt the ends of the boards up together.
This type of insulated roof assembly limits thermal bridging through rafters.
Some are cut to fit the plate while in hasty construction they are merely laid on top of the plate and nailed in place.
Rigid insulation layers exterior to existing roof sheathing must provide sufficient thermal insulation r value to control condensation risk see climate specific guidance.